Dow Chemical Company Mayflower EPDM Project

page 2 of 2

Field Electrical
The field portion of the electrical system included the installation of the grounding system for the entire processing unit. It also included installation of transformers, power panels, wire and cable ranging form 600 volt to 15kv, aluminum cable tray, rigid galvanized conduit, pilot devices, lighting, and receptacles. The following is a breakdown of the items and quantities installed in the field:
 

Description Quantity

480-240/120v Transformers 18 ea
Class I, Div. 2 Pwr. Panels 59 ea
Class I, Div. 2 Pilot Devices & Receptacles 446 ea
Class I, Div. 2 Light Fixtures 608 ea
Communications Devices 180 ea
Cable Tray 4,200 ft
Conduit 83,000 ft
Conduit/Tray Supports 7,400 ea
1/c #14-#6awg, 600v Wire 246,000 ft
1/c #4awg-500mcm, 600v Cable 5,800 ft
Multi-Conductor #14-16awg Cable 200,00 ft
Multi-Conductor #4awg-500mcm Cable 51,000 ft
1/c 5kv Cable 38,000 ft
1/c 15kv Cable 4,600 ft
#14-$16awg,600v Terminations 10,300 ea
#4awg-500mcm,600v Terminations 1,014 ea
5-15Kv Terminations 363 ea

Packaging and Shipping Facility
The packaging and shipping facility consists of a new 42,000 square foot building that houses a conveyor system, packaging and palletizing equipment, an office area with locker rooms and a lunch area, and a large storage area. On the building exterior, there is a 5 bay truck loading dock. Each dock has a power overhead door and an automatic dock leveling system. The building also includes 12 large 480v intake/exhaust fans for ventilation. The equipment in this building required numerous motor control and power circuits. The source of the power and controls is a new substation/mcc building located just outside. The work associated with this substation is described in the previous section on substation work.

This portion of the electrical system included the installation of a grounding system, transformers, power panelsl, high-bay lighting fixtures, safety switches, aluminum cable tray, rigid galvanized conduit, wire, cable, terminations, checkouts, and testing. The following is a list of items and quantities installed in this area:

Description Quantity

480-240/120v Transformers 3 ea
240v Power Panels 3 ea
Disconnect Switches 28 ea
High Bay Lighting Fixtures 59 ea
Misc. Lighting Fixtures 66 ea
Misc. Devices & Receptacles 68 ea
Cable Tray 930 ft
Conduit 13,500 ft
Conduit/Tray Supports 419 ea
Multi-Conductor #14-16awg Cable 20,000 ft
Multi-Conductor #4awg-500mcm Cable 600 ft
#14-#16awg,600v Terminations 2,600 ea
#4awg-500mcm,600v Terminations 39 ea

As a member of the project construction team, ISC was involved in addressing any issues concerning safety, quality, constructability, and schedule associated with this large "fast track", schedule-driven project. ISC's work force peaked at over 350 associates, with approximately 340,000 work hours expended to complete the project. The instrumentation and electrical installation contract exceeded 10.4 million dollars. The team concept was essential in assuring the successful completion of this project on time with an exemplary safety record, quality installations, and without interruption of the adjacent operating units.