Exxon Refinery USA Bulk Station Modification
Project
page 2 of 2
Electrical scope of work on this project included the
modification of sixty existing 1200-amp feeder breaker cubicles,
eighteen existing 3000-amp incomer breaker cubicles, and seven
existing bus differential cubicles. Additionally, fourteen existing
blank cells were retrofitted as incomer breaker cubicles and seven
existing blank cubicles were converted to bus differential cubicles.
Installed
for the project's eighty thousand terminations were over twenty-two
miles of internal switchgear wire used for controls and the
electrical monitor system, six hundred current transformers,
forty-eight line potential transformers, twenty-one bus potential
transformers, five hundred linear feet of new 3000-amp electrical
bus duct and five transformer ground resisters and foundations.
Over twenty-seven hundred control relays, switches, pilot lights,
and terminal blocks were also installed to complete the control
scheme. Finally, ISC installed four new dc battery systems,
including battery chargers, transfer switches, manual disconnect
switches, static switches and batteries.
In
addition to the electrical aspects of the Exxon Refinery Revamp
Project, ISC was also responsible for the scheduling, installation,
pre-check, and review of the testing and commissioning procedures.
Additionally, the project construction team insured that the
safety, quality, and timeliness of the project exceeded
specifications.