Completed in 2017

ABOUT THIS PROJECT

ExxonMobil, the worlds largest oil company, started construction of a multi-billion-dollar ethane cracker at its Baytown Texas facility. ExxonMobil contracted Mitsubishi Heavy Industries (MHI) to construct two large scale polyethylene plant lines capable of producing more than 1.3 Million tons of product per year.

MHI Sub-contracted ISC Constructors to Engineer, Procure, and  Construct this grassroots facility.

ENGINEERING SCOPE

  • Electric Power Distribution (34.5KV, 5KV, 480V, and 120V)
  • Underground & Aboveground Raceway Design
  • Grounding, Lighting, & Lightning Protection Design
  • Temporary Power Design for Site Complex ( Approximately 156 Acres)
  • Instrumentation